Construction Cleaning

POST-CONSTRUCTION CLEANING

Rough, final and turnover cleaning support for active construction and completed projects.

Prepare the property for its next handoff.

Construction cleaning depends on what stage the project has reached and what must be ready for the next inspection, walkthrough or occupancy. Southside reviews the areas, remaining trade activity and expected finish condition before confirming the cleaning phase.

Rough cleaning

Identify the accessible areas that need an initial cleaning pass and the debris present. Loose debris, fine dust and bulky construction waste require different handling. Confirm what material is to be removed and who handles disposal.

Final cleaning

Define the rooms, fixtures, surfaces and floors to be prepared for handoff. The agreed scope can include detailed cleaning of specified areas after trade work is complete, with interior and exterior glass reviewed separately where needed.

Touch-up and re-cleaning

Work after the final pass can introduce fresh dust or marks. If a touch-up before turnover is required, identify the timing and affected areas. Re-cleaning caused by later trade activity should be scoped rather than assumed to be included.

PLAN ACCESS AND SCHEDULING.

Send the construction schedule and tell us which buildings, floors or units will be released for cleaning. Confirm water, electricity, site access and the status of other trades. Cleaning sequences may need to follow phased handoffs. Exterior or elevated glass also needs an access plan and an agreed equipment arrangement.

WHAT TO SEND FOR A QUOTE.

Include the site address, approximate cleanable area, building or unit count, plans or photos, the cleaning phase and the target handoff dates. Identify glass quantities, adhesive or overspray, bulk waste and unfinished areas. Tell us who can approve the scope and how completion will be reviewed.

Related services: Construction glass and frame cleaning · Cleaning after occupancy.

BEFORE YOU BOOK.

Do we need rough, final and touch-up cleaning?

Not every project needs all three. Explain the current condition and the handoff requirements so the necessary passes can be identified and priced clearly.

Are exterior windows part of the quote?

They can be reviewed as part of the project, but sides of glass, frames, construction residue and elevated access must be specified. Request them explicitly when submitting the scope.

What happens if trades return after cleaning?

Tell us which areas were affected and what changed. A further cleaning pass may need a revised scope and schedule, especially when it falls outside the original handoff plan.

ACCOUNTABLE FROM
SCOPE TO COMPLETION.

Southside coordinates scope, scheduling and completion around the needs of the property or project. Final availability, pricing and acceptance are confirmed after review.